Latest news

   

 
Modernization   /  modernization - safetystrip brush system - examination

Modernization includes:

  • NEW!!! Installation of skirt brushes, which prevents accidents: pulling tight of clothes and shoes between skirt and step
  • Modernization of engine and working brake with reducing of working speed of escalators
  • Modernization of balustrade
  • Modernization of handrail system with replacement of guidings and sprockets
  • Installation of new safety devices: Handrail speed, drop and direction control safety device, Step plate integrity safety device. Replacement of out of date Track system speed and direction control device type ROU (using mercury) on modern electronic device
  • Installation of system of handrail disinfection (using UV-rays)
  • Reinforcement and reconstruction of truss and tunnel escalators elements.Is carried out following escalator examination (using methods of supersonic steel width examination and defectoscopy)
  • Installation of new lubricating systems of bearings and chains lubrication
  • Replacement of old control cabinets on the control cabinets of new design
  • Disassembling of escalator elements with replacement of worn parts on new
 
All rights reserved. 2006 Es-Servis
Creation and design - IT Concept